Project Gallery
- TOP
- Project Gallery
- Our urethane embankment construction was adopted in response to the Noto Peninsula Earthquake in 2024.
Our urethane embankment construction was adopted in response to the Noto Peninsula Earthquake in 2024.
- Road
- Lightweight Fill
This is a lightweight fill method in which urethane foam is foamed onsite as fill material.
This is a lightweight fill method in which urethane foam is foamed onsite as fill material, leaving no gaps at the bottom of aging bridges and other structures.
This is a lightweight fill method in which urethane foam is foamed onsite as fill material.
This is a lightweight fill method in which urethane foam is foamed onsite as fill material, leaving no gaps at the bottom of aging bridges and other structures.
Event Summary
This is a lightweight fill method in which urethane foam is foamed onsite as fill material. This is a lightweight fill method in which urethane foam is foamed onsite as fill material, leaving no gaps at the bottom of aging bridges and other structures. This is a lightweight fill method in which urethane foam is foamed onsite as fill material. This is a lightweight fill method in which urethane foam is foamed onsite as fill material, leaving no gaps at the bottom of aging bridges and other structures.
Interphex Week Tokyo Official Site
similar case
Our urethane embankment construction was adopted in response to the Noto Peninsula Earthquake in 2024.
Our urethane embankment construction was adopted in response to the Noto Peninsula Earthquake in 2024.
Related Product Pages
Oyupoly tube
Moisture-proof and heat insulation system ceiling
For inquiries about this article, please contact
Nagoya Head Office Sales Department Headquarters
TEL 052-684-0266 (direct line to sales headquarters)
Click here for inquiry form
